Here’s a little update on the bar. I have installed the upper cabinets and a couple of glass racks. Doors have been installed on the lower cabinets as well.  I added sheetrock between the upper and lower cabinets to cover up the previously exposed copper pipes.  The next step is to install the tile backsplash and install the fridge to the left of the bar. After the tile is installed, there will be glass racks that run the length of the upper cabinets. I think that I may be installing a panel between the bar and the furnace as well.