Here’s some shots of the bar progressing. The tile backsplash is installed and grouted. The draft system is all installed and working to perfection. My only problem seems to be brewing enough beer to have 2 beers on tap at once.

I still need a couple more glass racks for my ever growing collection of glassware, and a fridge for all my extra ingredients!

IMG_65111
 
IMG_6628
 
IMG_6633
 
IMG_6629

 

Advertisements